Pedament guide · New construction
2,838 active listings across Malta and Gozo with a publicly stated completion date 12+ months out. Sorted by soonest delivery.
Last updated ·Updates automatically from current listings
Across all active off-plan listings on Pedament
Live count
From all 2,838 listings
From 2,713 listings with price + size data
Fresh inventory
This page lists every active Malta listing whose description names a completion date at least 12 months from today. Pedament parses dates like "completion Q3 2027" or "ready by March 2028" directly from the agency-supplied text on every scrape — no manual curation.
Today: 2,838 upcoming listings at a median asking price of €346,000. Click any locality below to drill in, or read the guide for off-plan buyer mechanics.
Reservation → konvenju with bank guarantee on the deposit → staged payments tied to construction milestones → final deed on completion. The Property Sales (Off-Plan) Act 2018 caps deposit exposure and locks in the delivery date, with interest-bearing refunds if the developer slips. Compared to buying finished stock, the timeline doubles and the financing pattern is different.
Typical sequence for an off-plan unit completing in 2027 or later:
If the developer misses the agreed delivery date, the Act entitles the buyer to either an extension by mutual agreement or full refund of the deposit plus statutory interest. The Act applies to all residential off-plan sales in Malta — there is no exemption for small developments or for sales to foreign buyers.
The Off-Plan Act 2018 bank guarantee refunds your deposit (typically 10% of the price) if the developer fails to complete or becomes insolvent — but it does not cover staged payments beyond the deposit, opportunity cost, or rental income lost to a delayed handover. Recovery of anything beyond the deposit goes through Malta's civil courts, with property-dispute timelines typically running 2–5 years. The guarantor's own solvency is a tail risk worth checking.
The Property Sales (Off-Plan) Act 2018 requires the developer to lodge either a bank guarantee or an insurance bond covering the deposit amount before the konvenju is filed. If the developer collapses or misses the contracted completion date, the buyer can call on that guarantee to recover the deposit plus interest. This is the primary statutory protection, and in the typical case it works as intended — the guarantor pays out and the buyer walks away whole on the deposit.
What the guarantee does not cover is anything paid beyond the deposit. If the konvenju schedules a 30% structural-completion tranche and the buyer paid it before the developer went under, that 30% is at risk and recovery happens through civil-court litigation, ranking behind secured creditors — typically the bank that financed construction and holds a special hypothec over the building. Property-dispute cases in Malta's civil courts typically run 2–5 years from first hearing to judgment, longer with appeals.
Partial completion adds another layer. If the block is structurally up but unfinished when the developer fails, a liquidator or court-appointed administrator may sell the property to a third-party developer to complete, sometimes at a discount that erodes earlier buyers' equity. Buyers whose specific unit is identifiable on architect's plans and named in a notarial act have a stronger negotiating position than buyers who paid against a generic floor-plate; the konvenju and any registered notarial deeds are the anchors.
Two checks worth doing at konvenju: (1) read the actual guarantee document — it should name the guarantor, the amount, the trigger conditions, and the expiry; verify the guarantor is MFSA-regulated (MFSA supervises both banks and insurance undertakings in Malta); (2) look up the developer's past completed projects through agency archives and the Planning Authority eApplication portal. A first-time developer with no delivered track record is materially higher risk than one with several completed blocks behind them, even at the same headline price.
Minor amendments to the Planning Authority permit are routine and legal — façade material swaps, internal layout tweaks within the envelope, balcony sizing adjustments. Material changes (extra floors, common-area substitutions, unit count changes) require a fresh PA application and public consultation. Spec downgrades are the most common buyer dispute and are governed by the finishings schedule annexed to the konvenju, not by the permit itself. Pull the PA reference before signing and check for pending amendments.
Most off-plan projects in Malta evolve between launch and completion. The Planning Authority (PA) issues a development permit with a reference of the form PA/####/##, and the developer can submit amendments to that reference for minor changes — façade finish swaps, minor internal redesigns, balcony depth adjustments inside the permit envelope. These are routine, processed under a lighter procedure, and don't require buyer consent under the standard konvenju.
Material changes are different. Adding a floor, changing the unit mix, removing a communal pool or gym promised in the marketing materials, or substantially altering the façade outside the envelope all require either a fresh full application or a major-amendment procedure — and depending on the scale, a fresh public-consultation window may open during which buyers and neighbours can object. The konvenju typically gives the buyer a right to withdraw if a material change reduces the agreed spec, but the right has to be exercised promptly once the change is known.
Sanctioning is the third category: works built without a permit, then regularised after the fact through an enforcement-and-sanctioning procedure. Common targets are balcony enclosures, façade glazing additions, and footprint variations on the ground floor. Sanctioning carries a fine and is not always granted; if the PA refuses, the works have to be reversed. A development with multiple post-completion sanctioning applications on the eApplication portal is a quality-control signal worth noting before buying a unit in a follow-on project from the same developer.
The konvenju is where the spec actually lives — not the permit. Insist on a detailed finishings schedule annexed to the promise of sale, with brand and model references for kitchens, sanitaryware, tile size and grade, internal door specification, balcony glazing, lift make, and any communal amenities. Sample photos or showroom links attached to the konvenju give you something to enforce against at handover. A schedule that reads "tiles to be selected by the developer" effectively delegates the spec.
The single most predictive signal is the developer's past completed blocks at the 3–5 year mark — not at handover. Visit at least two delivered buildings from the same developer and inspect waterproofing, façade aging, sound insulation, lift maintenance, and common-area condition. Identify the structural contractor and the M&E subcontractors; ask about warranty terms in the konvenju. Anonymous reviews of past projects are spotty in Malta — direct inspection is the substitute.
Quality risk in Malta off-plan is harder to underwrite than legal or planning risk because there is no comprehensive quality register or rating system. The Malta Developers Association (MDA) maintains a voluntary membership list with a code of conduct, but membership is not a quality benchmark — non-members range from one-off self-builders to large unlisted developers, and MDA membership does not guarantee outcomes either.
The most predictive due-diligence step is visiting completed buildings from the same developer at the 3–5 year mark. New buildings look good at handover; the materials and workmanship that fail in Malta's climate fail visibly by year three. Specifically look at: roof waterproofing (water marks on top-floor ceilings, ponding on flat roofs), balcony railings and exposed metal (salt corrosion is severe within 500m of the coast), façade efflorescence and discolouration, internal corridor finishes, lift make and visible maintenance log, generator or UPS backup, garage drainage and lighting, and any visible cracking on structural elements. Photographs on the developer's website are a poor substitute — they are taken at handover, before the climate gets to them.
Sound insulation is the single most common post-completion complaint in Maltese apartments. Party walls and intermediate floors should be acoustically detailed — resilient layer, double-leaf wall construction, floating screed for footfall isolation — and these details only show in the cross-section drawings. If the developer cannot produce an acoustic specification, assume baseline performance: fine for owner-occupier solo living, marginal for shared-wall families or short-let rental use.
Contractor identity matters more than developer marketing. Most Maltese developers subcontract structure to a small pool of established main contractors, and M&E (mechanical, electrical, plumbing) work to specialist firms. Ask explicitly which contractor will execute the structural shell and which firm handles M&E; cross-check those names against other recently completed blocks visible on the eApplication portal. A reputable developer paired with an inexperienced contractor still carries quality risk. The konvenju is the place to lock expectations — including warranty terms on M&E, waterproofing guarantees, and a defects-liability period that extends past the first year of occupation.
On top of contractual warranties, Maltese law provides a statutory backstop: under the Civil Code, builders carry long-tail liability for major structural defects in the works — extending well beyond the typical one- or two-year defects-liability period in the konvenju — with claims having to be brought within a short prescription window once the defect is discovered. The regime covers serious failures of the building itself, not cosmetic issues or finishings, and runs against the contractor as well as the developer. It is the floor under any warranty negotiation, not a substitute for one. A property lawyer can confirm the current periods against the latest Civil Code text before signing.
Same as for finished property. SDA projects are AIP-exempt and unrestricted; non-SDA off-plan units need an AIP permit for non-EU buyers and clear a minimum-value threshold (€174,274 apartment / €300,619 house). EU buyers buying a primary residence are exempt regardless of project type.
The fact that a property is sold off-plan doesn't change the permit position. What matters is whether the development is inside a Special Designated Area. If it is, anyone of any nationality can buy without an AIP permit; if it's not, the same AIP rules apply as for any other Malta property.
One practical wrinkle: the AIP value test is applied at konvenju, not at final deed. If the property is below the minimum-value threshold at konvenju but the deed price ends up higher (because of optional upgrades or staged inflation), the permit position is checked on the konvenju number. Buyers using the AIP route on a marginal-value off-plan unit should price the contract carefully.
The locality breakdown below ranks every Malta and Gozo locality by the number of active upcoming listings on Pedament — order shifts daily as new projects launch and existing ones reach completion, so today's leaders may differ from a snapshot taken six months ago. Inner-harbour and central-region towns tend to dominate by absolute volume, while Gozo's Marsalforn and Xagħra have seen a steady rise in off-plan inventory since 2024, often targeting overseas retirees and second-home buyers.
The locality breakdown below ranks every Malta and Gozo locality by the number of upcoming off-plan listings currently advertised on Pedament. Counts move daily as agents add new projects and existing ones reach completion (at which point they drop off this page automatically — there's no manual curation).
For a deeper view of any specific locality's market data, click through to its full search-result page from the directory.
Ordered by number of active upcoming listings. The earliest completion date in each locality is shown alongside.
| Name | Region | Active | Median price | |
|---|---|---|---|---|
| Santa Venera Earliest completion Dec 2027 | Earliest completion Dec 2027 | 272 | — | |
| Msida Earliest completion Dec 2027 | Earliest completion Dec 2027 | 202 | — | |
| Fgura Earliest completion Dec 2027 | Earliest completion Dec 2027 | 197 | — | |
| Marsa Earliest completion Dec 2027 | Earliest completion Dec 2027 | 195 | — | |
| Pieta Earliest completion Oct 2027 | Earliest completion Oct 2027 | 125 | — | |
| Birkirkara Earliest completion Nov 2027 | Earliest completion Nov 2027 | 120 | — | |
| Qawra Earliest completion Oct 2027 | Earliest completion Oct 2027 | 111 | — | |
| Zurrieq Earliest completion Dec 2027 | Earliest completion Dec 2027 | 98 | — | |
| Zejtun Earliest completion Dec 2027 | Earliest completion Dec 2027 | 94 | — | |
| St Paul's Bay Earliest completion Dec 2027 | Earliest completion Dec 2027 | 84 | — | |
| Paola Earliest completion Dec 2027 | Earliest completion Dec 2027 | 78 | — | |
| Ghaxaq Earliest completion Dec 2027 | Earliest completion Dec 2027 | 74 | — | |
| Tarxien Earliest completion Dec 2027 | Earliest completion Dec 2027 | 74 | — | |
| Mosta Earliest completion Dec 2027 | Earliest completion Dec 2027 | 67 | — | |
| Birzebbuga Earliest completion Oct 2027 | Earliest completion Oct 2027 | 62 | — | |
| Qormi Earliest completion Oct 2027 | Earliest completion Oct 2027 | 56 | — | |
| Sliema Earliest completion Dec 2027 | Earliest completion Dec 2027 | 54 | — | |
| San Gwann Earliest completion Dec 2027 | Earliest completion Dec 2027 | 52 | — | |
| Ta' Xbiex Earliest completion Oct 2027 | Earliest completion Oct 2027 | 49 | — | |
| Senglea (Isla) Earliest completion Sep 2028 | Earliest completion Sep 2028 | 47 | — | |
| Zebbug Earliest completion Dec 2027 | Earliest completion Dec 2027 | 46 | — | |
| Lija Earliest completion Dec 2027 | Earliest completion Dec 2027 | 40 | — | |
| St Julian's Earliest completion Dec 2027 | Earliest completion Dec 2027 | 38 | — | |
| Qrendi Earliest completion Dec 2027 | Earliest completion Dec 2027 | 36 | — | |
| Siggiewi Earliest completion Dec 2027 | Earliest completion Dec 2027 | 35 | — | |
| Qala Earliest completion Dec 2027 | Earliest completion Dec 2027 | 33 | — | |
| Swieqi Earliest completion Oct 2027 | Earliest completion Oct 2027 | 33 | — | |
| Dingli Earliest completion Dec 2027 | Earliest completion Dec 2027 | 32 | — | |
| Naxxar Earliest completion Dec 2027 | Earliest completion Dec 2027 | 31 | — | |
| Sannat Earliest completion Dec 2027 | Earliest completion Dec 2027 | 29 | — | |
| Xewkija Earliest completion Dec 2027 | Earliest completion Dec 2027 | 29 | — | |
| Attard Earliest completion Oct 2027 | Earliest completion Oct 2027 | 28 | — | |
| Balzan Earliest completion Dec 2027 | Earliest completion Dec 2027 | 27 | — | |
| Bugibba Earliest completion Dec 2027 | Earliest completion Dec 2027 | 26 | — | |
| Mellieha Earliest completion Dec 2027 | Earliest completion Dec 2027 | 23 | — | |
| Mqabba Earliest completion Dec 2027 | Earliest completion Dec 2027 | 23 | — | |
| Iklin Earliest completion Dec 2027 | Earliest completion Dec 2027 | 20 | — | |
| Xlendi Earliest completion Dec 2027 | Earliest completion Dec 2027 | 19 | — | |
| Xemxija Earliest completion Dec 2027 | Earliest completion Dec 2027 | 17 | — | |
| Victoria (Rabat Gozo) Earliest completion Dec 2027 | Earliest completion Dec 2027 | 15 | — | |
| Marsaxlokk Earliest completion Dec 2027 | Earliest completion Dec 2027 | 14 | — | |
| Zabbar Earliest completion Dec 2027 | Earliest completion Dec 2027 | 14 | — | |
| Luqa Earliest completion Dec 2027 | Earliest completion Dec 2027 | 10 | — | |
| Hamrun Earliest completion Dec 2027 | Earliest completion Dec 2027 | 9 | — | |
| Kirkop Earliest completion Dec 2027 | Earliest completion Dec 2027 | 9 | — | |
| Rabat Earliest completion Dec 2027 | Earliest completion Dec 2027 | 9 | — | |
| Xghajra Earliest completion Dec 2027 | Earliest completion Dec 2027 | 9 | — | |
| Gharghur Earliest completion Dec 2027 | Earliest completion Dec 2027 | 8 | — | |
| Ibragg Earliest completion Dec 2027 | Earliest completion Dec 2027 | 8 | — | |
| Gzira Earliest completion Dec 2027 | Earliest completion Dec 2027 | 7 | — | |
| Mgarr Earliest completion Dec 2027 | Earliest completion Dec 2027 | 6 | — | |
| Kalkara Earliest completion Dec 2027 | Earliest completion Dec 2027 | 5 | — | |
| Kappara Earliest completion Mar 2028 | Earliest completion Mar 2028 | 5 | — | |
| Zebbiegh Earliest completion Dec 2027 | Earliest completion Dec 2027 | 5 | — | |
| Marsaskala Earliest completion Dec 2027 | Earliest completion Dec 2027 | 4 | — | |
| San Lawrenz Earliest completion May 2028 | Earliest completion May 2028 | 4 | — | |
| Nadur Earliest completion Dec 2027 | Earliest completion Dec 2027 | 3 | — | |
| Pembroke Earliest completion Apr 2028 | Earliest completion Apr 2028 | 3 | — | |
| Safi Earliest completion Dec 2027 | Earliest completion Dec 2027 | 3 | — | |
| Xaghra Earliest completion Oct 2027 | Earliest completion Oct 2027 | 3 | — | |
| Ghajnsielem Earliest completion Dec 2027 | Earliest completion Dec 2027 | 2 | — | |
| Fontana Earliest completion Oct 2027 | Earliest completion Oct 2027 | 1 | — | |
| Mriehel Earliest completion Dec 2027 | Earliest completion Dec 2027 | 1 | — | |
| Munxar Earliest completion Dec 2027 | Earliest completion Dec 2027 | 1 | — |
Showing 9 live listings.









Common questions
Listings where the description names an expected completion date at least 12 months from today. The page is restricted to off-plan and under-construction units — anything finished or already delivered is filtered out via the is_stale_completion flag, regardless of how recently it was built.
Agency listings often state completion only by year ("Completion 2027"). The page resolves a bare year conservatively to the end of that year, so a property listed as "completion 2027" appears on the page until 1 January 2027. Once an agent specifies a month or quarter, the date sharpens (e.g. "Q3 2027" → 30 September 2027).
Only if the project is outside the Special Designated Area (SDA) framework. Non-EU/EEA nationals need an Acquisition of Immovable Property permit to buy any non-SDA property; EU citizens are exempt for a primary residence or own-business use. Check each project's location against the SDA list before signing a konvenju.
Malta's Property Sales (Off-Plan) Act 2018 requires developers to lodge a bank guarantee or insurance bond for the deposit, file the konvenju within seven working days, and complete on the agreed delivery date or refund the deposit with interest. The promise of sale should specify completion date, finishings schedule, and remedies if the project slips.
The locality breakdown below ranks every Malta and Gozo locality by the number of upcoming listings currently advertised on Pedament — order shifts as new projects launch and existing ones reach completion. Inner-harbour and central-region towns tend to dominate by absolute volume; Gozo's Marsalforn and Xagħra have seen meaningful off-plan inventory growth since 2024.
The Off-Plan Act 2018 bank guarantee or insurance bond refunds the deposit (typically 10% of the price) if the developer fails to complete. Anything paid beyond the deposit — staged tranches at structural completion or finishes — is not covered and must be recovered through civil-court litigation, ranking behind the construction-finance bank. Maltese property-dispute cases typically run 2–5 years. Verify the guarantor's regulatory status at konvenju.
Minor amendments to the Planning Authority permit (façade material swaps, internal layout tweaks within the envelope) are routine and don't require buyer consent. Material changes — extra floors, communal-amenity substitutions, unit-count changes — need a fresh PA application and public consultation, and the konvenju typically gives the buyer a right to withdraw if a material change reduces the agreed spec. Finishings are governed by the schedule annexed to the konvenju, not by the permit itself.
The most predictive signal is visiting two or three of the developer's previously delivered blocks at the 3–5 year mark — Malta climate exposes waterproofing, façade aging, and common-area workmanship by then. Identify the structural contractor and M&E subcontractors and cross-check their other completed work. MDA (Malta Developers Association) membership is voluntary and is not a quality benchmark, but a first-time developer with no delivered track record carries materially higher risk than an established one.
Keep reading
The only route for most foreign buyers — Portomaso, Tigne Point, SmartCity and 20+ other AIP-exempt developments.
Read guideHeritage homes in protected streetscapes — reduced stamp duty, restoration grants, and live market data across every Malta UCA.
Read guideEvery cost beyond the listing price — stamp duty, notary, architect, agency, bank fees — with worked totals at €250k, €400k and €700k.
Read guideWhat's binding, the 10% deposit, the 21-day rule, and the asymmetric remedies when a buyer or seller withdraws under Maltese civil law.
Read guideLive asking prices, weekly listing volume and locality breakdowns aggregated from 15+ Malta agencies, updated daily.
Read guideInformation on this page is provided for general informational purposes only and does not constitute legal, tax, or investment advice. Always consult a qualified professional before making property decisions. Live market data is computed from current Pedament listings and may not reflect every listing on the market.
Browse every live listing filtered to exactly this criteria — updated daily from Malta's top agencies.
Browse all upcoming projects