Buying a home · Malta and Gozo
Buy Sustainable Property grant
Run by the Building and Construction Authority (BCA). Checked against official sources on 11 November 2026.
Last updated ·By Pedament Research
Buy Sustainable Property grant: €9,000 over three years (€3,000 a year) for a net-zero home, or €4,500 over three years (€1,500 a year) for a home 20% better than the minimum energy standard. It is run by the Building and Construction Authority (BCA). It applies in Malta and Gozo. Status on 11 November 2026: Closed.
- Amount
- €9,000 over three years (€3,000 a year) for a net-zero home, or €4,500 over three years (€1,500 a year) for a home 20% better than the minimum energy standard.
- Run by
- Building and Construction Authority (BCA)
- Status
- Closed
- Deadline
- 2026 call: applications by September 2026 (now closed).
- Full name
- Buy Sustainable Property Scheme 2026 (Grant on the Acquisition of Energy Efficient Residential Property)
- Where
- Malta and Gozo
- Type
- Buying a home
This scheme is closed
Applications are closed: on 8 Nov 2026 the BCA lists the scheme under 'Closed Schemes' ('Applications are now closed'). Applications opened on 17 March 2026 and the scheme was still listed as open on 1 Jun 2026. The conditions say applications were due by September 2026 after the deed, and the FAQ says end of September 2026 'or as announced'; the BCA has not published the exact closing date. Beneficiaries already approved keep getting annual payments. The Budget 2027 speech (26 Oct 2026) says on pp.56-57 that every scheme in place this year will be renewed for 2027, naming areas such as home purchase and renovation and renewable energy but no individual scheme; no 2027 notice had been published by 8 Nov 2026.
Who qualifies for the Buy Sustainable Property grant?
- Buyers of a residential property whose final deed was signed on or after 1 October 2025 (2026 call).
- Maltese citizens or EU citizens (EU citizens must satisfy criteria set by any Authority and/or the Office of the Prime Minister); for married couples or civil-union partners, one must be Maltese or EU.
- Apply after signing the deed, by September 2026.
Which properties qualify?
- Residential property only.
- Must have been built or renovated to the Minimum Energy Performance Requirements (Technical Document F) in force at the time.
- Asset-rating EPC must meet the net-zero (0 kWh/m2.yr) or '20% better than Document F' threshold.
- No stand-alone fossil-fuel boiler may be installed.
How much is it, and how is it paid?
€9,000 over three years (€3,000 a year) for a net-zero home, or €4,500 over three years (€1,500 a year) for a home 20% better than the minimum energy standard.
Two grants; each property and each beneficiary can get only one (conditions cl.3): (1) Net zero or less: EPC rating of 0 kWh/m2.yr and built/renovated to Technical Document F in force at the time - €9,000 paid €3,000 a year for 3 years. (2) Energy-efficient: built/renovated to Technical Document F and EPC 20% better than the Document F maximum energy demand (Figure 1, latest Document F as of 1 July 2024: terraced house 40 kWh/m2.yr without solar potential / 12 with; mid-floor flat 40/24; top-floor flat or maisonette 54/24; ground-floor maisonette 52/52; semi-detached villa 32/8; detached villa or bungalow 40/8) - €4,500 paid €1,500 a year for 3 years.
How it is paid: Once a year by bank transfer for three years; before each payment the beneficiary must confirm/update details by September or loses that year's payment.
How do I apply?
Step 1: Sign the final deed (on/after 1 October 2025).
Step 2: Register on the BCA webform/portal.
Step 3: Upload an asset-rating EPC and the documents listed in the conditions.
Step 4: A BCA board of experts checks eligibility, subject to funds; successful applicants sign an agreement with BCA.
Step 5: Confirm bank details each September to receive the annual payment.
Documents
- Asset-rating Energy Performance Certificate (EPC).
- Other supporting documents 'as stipulated in the conditions' (BCA page); neither the conditions nor the FAQ list them, and the application must be filed after the deed is signed.
What are the catches?
- Payments stop if the property is transferred to a third party within the three years; BCA must be told when the promise of sale is signed (conditions cl.8-9). Instalments already received need not be refunded (FAQ Q7).
- If a couple's marriage or relationship ends, the remaining instalments go to the partner who keeps the whole property (conditions cl.8).
- Missing the yearly September confirmation loses that year's instalment (conditions cl.3(c)-(d)).
- Deeds signed before 1 October 2025 do not qualify for the 2026 call (conditions cl.7(a)).
- Subject to funds; BCA may close early and may amend the scheme, even retroactively (conditions cl.15, 17).
- False information: fine, 5-year ban from BCA schemes, possible criminal action (conditions cl.12).
Can I combine it with other grants?
The conditions do not mention other schemes; they do not bar combining it with first-time buyer reliefs.
Related schemes
How has the scheme changed?
2025 call
For purchases after 1 January 2025; applications from 19 May 2025; same up-to-€9,000-over-3-years structure; closed.
2026 call
Purchases on/after 1 October 2025; applications from 17 March 2026; closed.
Official sources
- Buy Sustainable Property Scheme 2026Building and Construction Authority · checked 8 Nov 2026
- Buy Sustainable Property Scheme 2026 - ConditionsBuilding and Construction Authority · checked 8 Nov 2026
- BCA Schemes (open/closed list)Building and Construction Authority · checked 8 Nov 2026
- Buy Sustainable Property Scheme 2025Building and Construction Authority · checked 8 Nov 2026
- Diskors tal-Budget 2027 (pp.56-57, 'Skemi')Ministry for Finance · checked 8 Nov 2026
- Buy Sustainable Property Scheme 2026 - FAQsBuilding and Construction Authority · checked 8 Nov 2026
Legal basis: Administrative scheme of the Building and Construction Authority (established under Cap. 623); energy thresholds per Technical Document F (Minimum Energy Performance Requirements), latest version as of 1 July 2024. The Maltese text of the conditions prevails (cl.16).
Common questions
Frequently asked questions
€9,000 over three years (€3,000 a year) for a net-zero home, or €4,500 over three years (€1,500 a year) for a home 20% better than the minimum energy standard.
Buyers of a residential property whose final deed was signed on or after 1 October 2025 (2026 call). Maltese citizens or EU citizens (EU citizens must satisfy criteria set by any Authority and/or the Office of the Prime Minister); for married couples or civil-union partners, one must be Maltese or EU. Apply after signing the deed, by September 2026.
Status on 11 November 2026: Closed. Applications are closed: on 8 Nov 2026 the BCA lists the scheme under 'Closed Schemes' ('Applications are now closed').
Keep reading
Related Pedament guides
Property grants in Malta & Gozo
32 grants, subsidies and stamp duty reliefs in one list, with what is open now.
Read guideIrrinova Darek renovation grant
75% of eligible energy-efficiency renovation costs (90% for lower-income families on the In-Work Benefit) up to €15,000, plus up to €875…
Read guideFirst-time buyer grant (€10,000)
€10,000 over 10 years (€1,000 a year); €20,000 (€2,000 a year) for a first-time buyer with an EU Disability Card
Read guideFirst-time buyer stamp duty exemption
No duty on the first €200,000 of the price (saves up to €7,000)
Read guideAmounts and rules are set by the issuing body and can change; confirm with them before you apply. Checked against official sources on 11 November 2026. This page is general information, not legal or tax advice.
Ready to explore?
Compare this scheme with the other grants and reliefs in this guide.
See all 32 schemes