Energy and water · Malta and Gozo

Solar PV and battery grant

Run by the Regulator for Energy and Water Services (REWS). Checked against official sources on 11 November 2026.

Last updated ·By Pedament Research

Solar PV and battery grant: 65% of PV costs up to €3,000 (and €645 per kWp), plus 75% of battery costs up to €6,000 (and €600 per kWh); +5% for NZIA-compliant equipment. It is run by the Regulator for Energy and Water Services (REWS). It applies in Malta and Gozo. Status on 11 November 2026: Closed.

Amount
65% of PV costs up to €3,000 (and €645 per kWp), plus 75% of battery costs up to €6,000 (and €600 per kWh); +5% for NZIA-compliant equipment.
Run by
Regulator for Energy and Water Services (REWS)
Status
Closed
Deadline
Closed to new Part A applications from 12 September 2026. Approved applicants: Part B within 8 months of the offer letter.
Full name
Renewable Energy Sources (RES) Scheme 2026: grant for solar PV with hybrid inverter and battery storage
Where
Malta and Gozo
Type
Energy and water

This scheme is closed

REWS stopped accepting new applications on 12 Sep 2026, earlier than the 30 Nov 2026 end date first advertised. GN 1335 of 2026 (Gazette 4 Sep 2026) stopped applications for a PV system with hybrid inverter, with or without battery storage; the 30 Nov 2026 end date was in GN 597/2026. From 13 July 2026 the battery-related options were withdrawn for new applicants (GN 1060/2026). Applicants already approved still submit Part B within 8 months of the offer letter. The Budget 2027 speech (26 Oct 2026) says on pp.56-57 that every scheme in place this year will be renewed for 2027, naming areas such as home purchase and renovation and renewable energy but no individual scheme; no 2027 notice had been published by 8 Nov 2026.

Who qualifies for the solar PV and battery grant?

  • Private individual (natural person), resident of Malta, aged 18+, or a non-economic organisation (communal residences).
  • Owner or emphyteuta of the property, or holder of a long lease with more than the 5-year durability period left and the owner's consent; joint owners may apply for the others with their agreement.
  • Property used mainly as the applicant's or family's own residence; landlords, developers and commercially let property are excluded, even if tenants live there.
  • Electricity bill in the applicant's name for the property, on a residential tariff, issued within the last 12 months.
  • Nobody in the household received a grant for a similar system since 2010, and no open offer under a similar PV or battery scheme.
  • An existing PV that still holds a feed-in tariff allocation cannot be funded (the guaranteed period must have expired). A new grant-funded PV can still get the 10.5c tariff through section (vii) of Part A.

Which properties qualify?

  • Residential property in Malta or Gozo; not caravans, boats, boathouses or non-residential parts of buildings.
  • PV must be new, complete, grid-connected, over 1 kW; battery new and complete, over 2 kWh.
  • Models must be on the REWS registered products list.
  • Planning permission where required, obtained before installation; the building must comply with planning (inspections possible).
  • Adequate sun exposure; poor exposure can disqualify or lead to recovery.
  • System must stay installed, connected and working for 5 years after payment (durability period); changes need REWS approval.

How much is it, and how is it paid?

65% of PV costs up to €3,000 (and €645 per kWp), plus 75% of battery costs up to €6,000 (and €600 per kWh); +5% for NZIA-compliant equipment.

Option A, PV system with hybrid inverter: 65% of eligible costs, max €3,000 per system and €645/kWp. PV with hybrid inverter and battery: the same PV grant plus 75% of eligible battery costs, max €6,000 per system and €600/kWh. The leaflet also listed Option B (hybrid/battery inverter + battery for existing PV owners: inverter max €1,800/system and €350/kWp, battery 75% max €6,000) and Option C (battery only, 75% max €6,000 and €600/kWh); both closed to new applicants from 13 July 2026. NZIA-compliant equipment gets an extra 5% financial compensation (GN 597/2026 Schedule); the notice does not say whether that 5% can go above the €3,000 and €6,000 maximums. Eligible costs include VAT and cover modules, inverters, frame, battery, interface modules, wiring/installation, certification; less discounts and offers in kind.

How it is paid: Reimbursement by bank transfer after REWS approves Part B with all documents. The applicant can ask for the grant to be paid directly to the supplier. No payment deadline is published.

How do I apply?

  1. Step 1: Part A online on schemes.rews.org.mt (or paper form by post/hand to REWS, Zentrum Business Centre, Level 1, Mdina Road, Qormi QRM 9010) BEFORE buying or installing anything.

  2. Step 2: Approval is by grant offer letter (email). Do not sign a binding contract or pay any deposit before it.

  3. Step 3: Install and commission within 8 months of the offer letter.

  4. Step 4: Submit Part B with documents before the deadline on the offer letter.

Documents

  • Part A: copy of ID card or residence document; ARMS Ltd electricity/water bill for the site in the applicant's name; itemised quotation (retailer VAT no., module/inverter/battery models, kWp, kWh, expected kWh/year, costs, discounts); signed form (handwritten signature); de minimis declaration; tenants and lessees attach a copy of the lease.
  • Part B: original fiscal receipt(s); invoice(s); photos of rating plates and of the installation; PA permit copy where applicable; commissioning certificate by a warranted electrical engineer; signed form.

What are the catches?

  • Buying or paying a deposit before the offer letter makes you ineligible.
  • Anyone in the household who got a PV grant since 2010 blocks a new PV grant.
  • Landlords cannot claim; homes let commercially are excluded.
  • Grant-funded PV gets the lower 10.5c/kWh feed-in tariff, not 15c (see the solar PV feed-in tariff page).
  • If you sell within 5 years, the deed must transfer the obligations to the buyer; otherwise REWS can recover the grant with interest.
  • Payment must be from an account in your (household's) name; business accounts are not accepted.
  • Funds are limited and first come, first served; the call closed months before the advertised end date.
  • No VAT recovery or other public grant on the same equipment.
  • Selling a home with a grant-funded PV or battery inside the 5-year durability period needs the REWS 'transfer or relocation of a RES system' procedure.

Can I combine it with other grants?

Cannot be combined with any other public grant or subsidy for the same system or technology. Comes with the reduced 10.5c/kWh feed-in tariff for grant-funded PV (S.L. 545.27, Second Schedule item 4). Separate technologies (e.g. a solar water heater under the 2025 Water Heater Scheme, roof insulation under RIDG) are separate schemes; the guidelines do not forbid holding them together.

Related schemes

How has the scheme changed?

  1. 2024 RES call (GN 270/2024) closed to Part A from 1 Jan 2025.

  2. 2025 RES call (GN 319/2025) closed to Part A from 11 Aug 2025 (GN 1273/2025).

  3. 2026 call launched 16 Apr 2026 (GN 597/2026, Gazette 17 Apr 2026), applications from 20 Apr 2026, advertised to 30 Nov 2026 or until funds run out.

  4. 13 Jul 2026

    Battery-related options withdrawn for new Part A applications (GN 1060/2026).

  5. 12 Sep 2026

    Part A closed (GN 1335 of 2026, Gazette 4 Sep 2026).

  6. 26 Oct 2026

    The Budget 2027 speech says on pp.56-57 that every scheme in place this year will be renewed for 2027, naming areas such as home purchase and renovation and renewable energy but no individual scheme; no 2027 notice had been published by 8 Nov 2026.

Official sources

Legal basis: Government Notice 597 of 2026 (Govt Gazette 17 Apr 2026), amended by GN 1060 of 2026 (14 Jul 2026); closed to new applications from 12 Sep 2026 by GN 1335 of 2026 (Gazette 4 Sep 2026). De minimis Regulation (EU) 2023/2831 for organisations.

Common questions

Frequently asked questions

65% of PV costs up to €3,000 (and €645 per kWp), plus 75% of battery costs up to €6,000 (and €600 per kWh); +5% for NZIA-compliant equipment.

Private individual (natural person), resident of Malta, aged 18+, or a non-economic organisation (communal residences). Owner or emphyteuta of the property, or holder of a long lease with more than the 5-year durability period left and the owner's consent; joint owners may apply for the others with their agreement. Property used mainly as the applicant's or family's own residence; landlords, developers and commercially let property are excluded, even if tenants live there.

Status on 11 November 2026: Closed. REWS stopped accepting new applications on 12 Sep 2026, earlier than the 30 Nov 2026 end date first advertised.

Amounts and rules are set by the issuing body and can change; confirm with them before you apply. Checked against official sources on 11 November 2026. This page is general information, not legal or tax advice.

Ready to explore?

Compare this scheme with the other grants and reliefs in this guide.

See all 32 schemes