Roof insulation and double glazing grant: 50% of costs up to €1,000 for retrofitted roof insulation and 50% up to €1,000 for retrofitted double glazing. It is run by the Regulator for Energy and Water Services (REWS). It applies in Malta and Gozo. Status on 11 November 2026: Ends 31 Dec 2026.
- Amount
- 50% of costs up to €1,000 for retrofitted roof insulation and 50% up to €1,000 for retrofitted double glazing.
- Run by
- Regulator for Energy and Water Services (REWS)
- Status
- Ends 31 Dec 2026
- Deadline
- 31 December 2026. Install and submit Part B within 6 months of the funds confirmation letter.
- Full name
- Roof Insulation and Double Glazing (RIDG) Retrofitting Scheme
- Where
- Malta and Gozo
- Type
- Energy and water
Ends 31 Dec 2026
GN 2031/2025 (23 Dec 2025) extended the scheme to 31 Dec 2026. The Budget 2027 speech (26 Oct 2026) says on pp.56-57 that every scheme in place this year will be renewed for 2027, naming areas such as home purchase and renovation and renewable energy but no individual scheme; no 2027 notice had been published by 8 Nov 2026. It is the 2023 call (GN 1540/2023), extended by GN 18/2024, GN 03/2025 and GN 2031/2025. Funds are limited and given first come, first served.
Who qualifies for the roof insulation and double glazing grant?
- Private individual (natural person) for own residence, or an organisation not carrying out an economic activity (REWS page).
- Resident of Malta, 18+, with ID card or residence permit.
- Freehold owner, or holder of a long lease with more than 5 years left and the owner's consent; own residence, not let commercially, not a landlord, no economic activity there.
- Residential/domestic electricity bill for the site.
- Households that already benefited from (or have an open offer under) a similar roof insulation / double glazing scheme are excluded; other household members cannot apply for the same technology.
Which properties qualify?
- Retrofit only, on an existing residence; the building must be covered by a planning permit, plus permission for the works where required.
- Products bought in Malta from a REWS-registered retailer, model on the registered list.
- Double glazing: final U-value 3.7 W/m2K or better; installer certifies the gap.
- Roof insulation: final U-value of the whole roof not above 0.4 (W/m2K), confirmed by an architect's certificate.
- 5-year warranty; must remain installed 5 years.
How much is it, and how is it paid?
50% of costs up to €1,000 for retrofitted roof insulation and 50% up to €1,000 for retrofitted double glazing.
Roof insulation: 50% of the insulation material and its fixing incl. VAT, max €1,000; excludes screed (kontrabejt), torba chippings, membranes, tiles, stone/wood, shading, permits, certification. Double glazing: 50% of the aperture and its fixing incl. VAT, max €1,000; excludes plastering, decorating, permits, certification. Each measure has its own €1,000 cap. The official documents do not state a combined maximum.
How it is paid: Bank transfer, only to the applicant, after REWS approves Part B.
How do I apply?
Step 1: Part A online on schemes.rews.org.mt (or paper form by post/hand to REWS, Zentrum Business Centre, Level 1, Mdina Road, Qormi QRM 9010) BEFORE buying or installing anything.
Step 2: Wait for the REWS approval (funds confirmation / grant offer letter) by email.
Step 3: Buy and install; pay by traceable means.
Step 4: Submit Part B (request for reimbursement) with receipts and photos by the deadline on the approval letter.
Documents
- ID/residence document copy.
- ARMS Ltd water and electricity bill for the site in applicant's name.
- Lease contract if applicable.
- Original fiscal receipts and invoices.
- Photos of old and new material/apertures.
- PA permit copy where required.
- Copy of 5-year guarantee.
- Completion certificate by architect or installer.
- Signed form (handwritten).
What are the catches?
- Receipts dated before the scheme launch are ineligible; buying before approval risks the grant.
- New builds do not qualify: retrofitting only.
- A previous RIDG-type grant to the household blocks a new one.
- The roof U-value needs an architect's certificate, an extra cost not covered by the grant.
Can I combine it with other grants?
No other national or EU funds for the same works. Separate from the Birzebbuga double-glazing scheme (similar-scheme beneficiaries are excluded).
Related schemes
How has the scheme changed?
First 2023 call
Applications from 13 Nov 2023 to the end of 2023 (GN 1540/2023), then extended yearly.
Earlier schemes
2022 RIDG, 2018 roof insulation and double glazing, and a 2012-2018 scheme (REWS lists them as inactive).
Official sources
- Government Notice 1540 of 2023 (Govt Gazette 10 Nov 2023)Department of Information · checked 11 Nov 2026
- Government Gazette notices of 23 Dec 2025 (GN 2030-2034 of 2025, REWS scheme extensions to 31 Dec 2026)Department of Information · checked 11 Nov 2026
- 2023 RIDG (Retrofitting) SchemeRegulator for Energy and Water Services (REWS) · checked 8 Nov 2026
- 2023 Roof Insulation and Double Glazing (Retrofitting) Schemeservizz.gov.mt · checked 8 Nov 2026
- RIDG 2023 Guidelines for Applicants (updated)Regulator for Energy and Water Services (REWS) · checked 8 Nov 2026
- Diskors tal-Budget 2027 (26 Oct 2026), pp.56-57Ministry for Finance · checked 8 Nov 2026
- RIDG Retrofitting Scheme: Part A application formRegulator for Energy and Water Services (REWS) · checked 11 Nov 2026
Legal basis: Government Notice 1540 of 2023 (10 Nov 2023); extensions GN 18/2024, GN 03/2025, GN 2031/2025 (23 Dec 2025).
Common questions
Frequently asked questions
50% of costs up to €1,000 for retrofitted roof insulation and 50% up to €1,000 for retrofitted double glazing.
Private individual (natural person) for own residence, or an organisation not carrying out an economic activity (REWS page). Resident of Malta, 18+, with ID card or residence permit. Freehold owner, or holder of a long lease with more than 5 years left and the owner's consent; own residence, not let commercially, not a landlord, no economic activity there.
Status on 11 November 2026: Ends 31 Dec 2026. GN 2031/2025 (23 Dec 2025) extended the scheme to 31 Dec 2026.
Keep reading
Related Pedament guides
Property grants in Malta & Gozo
32 grants, subsidies and stamp duty reliefs in one list, with what is open now.
Read guideIrrinova Darek renovation grant
75% of eligible energy-efficiency renovation costs (90% for lower-income families on the In-Work Benefit) up to €15,000, plus up to €875…
Read guideWell and cistern restoration grant
50% of restoration costs plus the architect's or engineer's certification (certification up to €100), up to €1,000 in total, to restore an…
Read guideAmounts and rules are set by the issuing body and can change; confirm with them before you apply. Checked against official sources on 11 November 2026. This page is general information, not legal or tax advice.
Ready to explore?
Compare this scheme with the other grants and reliefs in this guide.
See all 32 schemes