Restoration and heritage · Gozo
Gozo façade restoration grant
Run by the Planning Authority, with the Ministry for Gozo and Planning (EU ERDF funds). Checked against official sources on 11 November 2026.
Last updated ·By Pedament Research
Gozo façade restoration grant: Up to €15,000 for a heritage building and up to €25,000 for a Grade 1 or Grade 2 scheduled building, per request for funding, for façade works in Gozo UCAs. It is run by the Planning Authority, with the Ministry for Gozo and Planning (EU ERDF funds). It applies in Gozo. Status on 11 November 2026: Closed.
- Amount
- Up to €15,000 for a heritage building and up to €25,000 for a Grade 1 or Grade 2 scheduled building, per request for funding, for façade works in Gozo UCAs.
- Run by
- Planning Authority, with the Ministry for Gozo and Planning (EU ERDF funds)
- Status
- Closed
- Full name
- Built Heritage Restoration Scheme (Gozo UCAs, ERDF co-funded façade restoration grant)
- Maltese name
- Skema ta' Restawr ta' Bini Antik fiż-Żoni ta' Konservazzjoni Urbana
- Where
- Gozo
- Type
- Restoration and heritage
This scheme is closed
Call II, open to all Gozo UCAs, took expressions of interest from 11 Nov 2025 at 13:30 to 28 Nov 2025 at 13:00. Call I covered the Victoria (Rabat, Gozo) UCA only and opened on 21 Apr 2025. No call was open on 8 Nov 2026 and no Call III has been announced; it was followed by the Irrestawra Darek u l-Villaġġ Għawdex call (25 Mar-1 Apr 2026).
Who qualifies for the Gozo façade restoration grant?
- General public; property must be in residential use (PA page).
- Privately owned residential heritage buildings and privately owned residential Grade 1/2 scheduled buildings within the UCAs of Gozo.
Which properties qualify?
- Within a Gozo UCA; residential use.
- Façade elements only (no internal works).
- Call I (Victoria) was limited to residential properties in the Rabat (Gozo) UCA that had never benefited from similar PA schemes (gov.mt PR250655); the Call II exclusion wording is in the guidelines.
How much is it, and how is it paid?
Up to €15,000 for a heritage building and up to €25,000 for a Grade 1 or Grade 2 scheduled building, per request for funding, for façade works in Gozo UCAs.
Heritage (non-scheduled) residential building in a Gozo UCA: max €15,000. Privately owned residential Grade 1 or Grade 2 scheduled building in a Gozo UCA: max €25,000. Caps apply per request for funding and cover craftsmanship, materials and equipment hire for façade elements (stone, timber, wrought iron: maintenance, restoration, replacement). Call II budget: the amount left over from Call I (Victoria) of the original €5m EU funds, for eligible ERDF localities, plus €500,000 of PA funds (PA page; gov.mt PR251996).
How it is paid: The Planning Authority administers the scheme, monitors the works and makes the eligible payments; works start only once it approves the request. When and how payment is made is set out in the Call II guidelines.
How do I apply?
Step 1: Phase 1: expression of interest, filed personally online or at the PA front desk (Gozo or Malta); registration number by email.
Step 2: The PA verifies submissions and asks for a site plan.
Step 3: Phase 2: a Perit submits the request for funding through eApps within the dates set.
Step 4: Queries: PA Customer Care 2290 0000.
Documents
- Expression of interest (no technical documents).
- Site plan (on PA request).
- Phase 2 file via Perit (eApps); full list in the guidelines PDF.
What are the catches?
- Short window (about 2.5 weeks); late submissions are not accepted.
- Lower caps for scheduled buildings (€25,000) than the 2026 Irrestawra Darek u l-Villaġġ (€50,000/€100,000).
- Residential use only, unlike Irrestawra Darek u l-Villaġġ, which also admits businesses and NGOs.
Can I combine it with other grants?
Not stated on the PA page. Under the PA's general rule (set out in the 2026 Irrestawra Darek guidelines), a property that received any PA scheme refund from 2017 cannot benefit again, so it is very likely exclusive with Irrestawra Darek u l-Villaġġ.
Related schemes
How has the scheme changed?
Call I
Victoria (Rabat, Gozo) UCA, €5m EU (ERDF) funds, launched by the Ministry for Gozo and Planning on 21 Apr 2025 (gov.mt PR250655; the €5m EU-funded scheme for Victoria UCA and the remaining Gozo UCAs is also mentioned in the PA IDVSB26 guidelines).
Call II
Extended to all Gozo UCAs, 11 to 28 Nov 2025, with leftover EU funds plus €500,000 PA funds (PA page; gov.mt PR251996).
Followed by the Gozo regional call of Irrestawra Darek u l-Villaġġ (25 Mar to 1 Apr 2026, €2m), which the Minister described as building on this scheme (gov.mt PR260485).
Official sources
- Built Heritage Restoration SchemePlanning Authority · checked 8 Nov 2026
- IDVSB26 Guidance Notes (mentions the €5m EU-funded Victoria/Gozo UCA scheme)Planning Authority · checked 8 Nov 2026
- Stqarrija: Titnieda Skema ġdida ta' Restawr ta' Bini Antik fil-Belt Victoria b'fondi tal-Unjoni Ewropea (21 Apr 2025)Ministry for Gozo and Planning (DOI) · checked 11 Nov 2026
- Stqarrija: L-Iskema ta' Restawr ta' Bini Antik fiż-Żoni ta' Konservazzjoni Urbana tinfetaħ għall-proprjetajiet residenzjali kollha f'Għawdex (11 Nov 2025)Ministry for Gozo and Planning / Ministry for European Funds (DOI) · checked 11 Nov 2026
- Stqarrija: Tinfetaħ għar-Reġjun Għawdex l-iskema 'Irrestawra Darek u l-Villaġġ' (25 Mar 2026)Ministry for Gozo and Planning (DOI) · checked 11 Nov 2026
Legal basis: PA grant scheme co-funded by the EU through the European Regional Development Fund under the Sustainable Urban Development priority reserved for Gozo (€58m in total), with the financial backing of the Government of Malta; Call II adds €500,000 of PA (national) funds.
Common questions
Frequently asked questions
Up to €15,000 for a heritage building and up to €25,000 for a Grade 1 or Grade 2 scheduled building, per request for funding, for façade works in Gozo UCAs.
General public; property must be in residential use (PA page). Privately owned residential heritage buildings and privately owned residential Grade 1/2 scheduled buildings within the UCAs of Gozo.
Status on 11 November 2026: Closed. Call II, open to all Gozo UCAs, took expressions of interest from 11 Nov 2025 at 13:30 to 28 Nov 2025 at 13:00.
Keep reading
Related Pedament guides
Property grants in Malta & Gozo
32 grants, subsidies and stamp duty reliefs in one list, with what is open now.
Read guideIrrestawra Darek
100% of eligible restoration costs, capped at €15,000 for a property in a UCA, €50,000 for a Grade 2 scheduled building in a UCA and…
Read guideIrrestawra Darek: scheduled buildings outside UCAs
100% of eligible costs, up to €100,000 for a Grade 1 or €50,000 for a Grade 2 scheduled building outside a UCA; €15,000 per owner where the…
Read guideAmounts and rules are set by the issuing body and can change; confirm with them before you apply. Checked against official sources on 11 November 2026. This page is general information, not legal or tax advice.
Ready to explore?
Compare this scheme with the other grants and reliefs in this guide.
See all 32 schemes