Restoration and heritage · Malta and Gozo
Irrestawra Darek: scheduled buildings outside UCAs
Run by the Planning Authority (Heritage Planning Unit / Development Planning Fund Committee). Checked against official sources on 11 November 2026.
Last updated ·By Pedament Research
Irrestawra Darek: scheduled buildings outside UCAs: 100% of eligible costs, up to €100,000 for a Grade 1 or €50,000 for a Grade 2 scheduled building outside a UCA; €15,000 per owner where the building has several owners filing separately. It is run by the Planning Authority (Heritage Planning Unit / Development Planning Fund Committee). It applies in Malta and Gozo. Status on 11 November 2026: Unclear.
- Amount
- 100% of eligible costs, up to €100,000 for a Grade 1 or €50,000 for a Grade 2 scheduled building outside a UCA; €15,000 per owner where the building has several owners filing separately.
- Run by
- Planning Authority (Heritage Planning Unit / Development Planning Fund Committee)
- Status
- Unclear
- Full name
- Irrestawra Darek u l-Villaġġ: grant scheme for Grade 1 or Grade 2 scheduled buildings outside UCAs, Malta & Gozo 2026 (IDVSB26)
- Maltese name
- Irrestawra Darek u l-Villaġġ – Bini Skedat barra ż-ŻKU
- Where
- Malta and Gozo
- Type
- Restoration and heritage
Status unclear
Call 1 closed on 16 Mar 2026; a second call with a further €1m was announced on 18 Jun 2026, but the Planning Authority has published no opening or closing dates for it. Call 1 took expressions of interest from 9 Mar 2026 at 09:00 to 16 Mar 2026 at 15:00. It received 99 submissions, of which 14 qualified for Phase 2, using about €1m of the €2m allocation; €500,000 of the unused money was moved to the Gozo UCA call. The second call was reported in the press as opening on 2 Jul 2026. A 2027 call is not confirmed: the Budget 2027 speech (26 Oct 2026) gives only a general pledge to renew this year's schemes, and no 2027 notice had been published by 8 Nov 2026. Ask the Planning Authority whether a call is open.
Who qualifies for Irrestawra Darek for scheduled buildings outside UCAs?
- Owners, tenants or emphyteuta of a Grade 1 or Grade 2 scheduled building located outside a UCA, in Malta or Gozo.
- Private individuals or legal entities, undertakings (de minimis aid, max €300,000 per single undertaking over 3 rolling years, published in a central register from 1 Jan 2026) and registered NGOs.
- Any use of the building is allowed (not limited to residential).
- Individuals or companies with pending financial contributions owed to the PA are ineligible until these are settled.
Which properties qualify?
- Must be scheduled Grade 1 or Grade 2 (check the PA Scheduled Property Register or the Mapserver 'Scheduling (HS)' layer) and lie outside a UCA.
- Excluded: buildings that benefited from any PA scheme with a refund from 2017 onwards; buildings with an active enforcement notice, pending enforcement or pending regularisation; a pending appeal or reconsideration request against scheduling, unless withdrawn.
- Not funded: works not in the LoCA; alterations or additions; recent extensions; demolition; reconstruction unless it counts as restoration; non-traditional materials (aluminium, PVC, plywood, etc.); sandblasting, power washing, 'invjar', chipping or 'tbaqqin', which are also subject to enforcement.
- Restoration works need a PA permit plus an approved Restoration Method Statement; maintenance needs a works method statement.
- Invoices are valid only from 1 Jan 2026. Completion is due within 48 months of the LoCA, with no extension.
How much is it, and how is it paid?
100% of eligible costs, up to €100,000 for a Grade 1 or €50,000 for a Grade 2 scheduled building outside a UCA; €15,000 per owner where the building has several owners filing separately.
Grade 1 scheduled building (outside UCA): up to €100,000. Grade 2 scheduled building (outside UCA): up to €50,000. Multiple ownership: each owner (each submission) up to €15,000, OR one consolidated application by all owners, with a holistic restoration approach, qualifies for the full €100,000 or €50,000. Covers craftsmanship, materials and equipment hire. Eligible works: façade (street-facing only), internal elements (walls, 'xorok', 'kileb', beams, arches, staircases, roofing, damp proofing) and garden elements (boundary walls, wells and reservoirs). The PA waives planning application fees for the restoration and the monitoring fees. Call 1 budget: €2m of PA funds.
How it is paid: Paid directly to the beneficiary against original fiscal receipts in the beneficiary's name, after the works are completed and inspected. Up to 3 claims, based on phased bills of quantities approved by the PA. The total never exceeds the amount in the LoCA, and lower receipts mean a lower payment.
How do I apply?
Step 1: Phase 1: expression of interest filed personally online (PA website, registerformapplicants.pa.org.mt) or at the PA front desk, Malta or Gozo, within the call window. A registration number is emailed.
Step 2: The PA asks qualifying applicants for a site plan.
Step 3: Phase 2: a Perit submits the request for funding through eApps within 2 months of the PA's notice.
Step 4: The Heritage Planning Unit issues a Letter of Validation; the DePFC decides; a Letter of Conditional Approval (LoCA) follows.
Step 5: File the scheme commencement notice at least 5 days before works start (Perit via eApps, or beneficiary by email to [email protected]), plus the permit commencement notice.
Step 6: On completion: inspection by the PA or the Superintendence of Cultural Heritage, then DePFC approval, then receipts (scanned, then originals by registered mail) and the bank form.
Documents
- Request form plus a signed scanned copy.
- PA site plan from 2025 or later at 1:2500, edged red.
- Colour photos of the façade and the interiors to be restored.
- Works method statement (maintenance); PA permit plus RMS (restoration).
- BoQ on the PA template only, VAT-inclusive, with no contingency or VAT lines.
- De minimis declaration (undertakings).
- Owner or co-owner consent declaration; declaration signed by all owners for a consolidated application.
- Original fiscal receipts in the beneficiary's name, and a bank details form.
What are the catches?
- First come, first served. The PA may close early when the budget is reached, and an expression of interest does not guarantee a grant.
- Call 1 was a one-week window (9 to 16 Mar 2026).
- Validated BoQ cannot be changed unless the DePFC asks. The LoCA completion deadline (48 months) is final.
- Any PA refund on the building since 2017 disqualifies it.
- A breach of the scheme after payment means a full refund.
- PA decisions are final, with no appeal.
- Multi-owner buildings: filing separately caps each owner at €15,000; the full cap needs one consolidated application signed by all owners, with the PA paying the nominated applicant.
Can I combine it with other grants?
No PA scheme can be used again on a building that got a PA refund from 2017. Undertakings must count it within the €300,000 de minimis ceiling together with all other de minimis aid. Combination with the MFin restoration grant is not addressed in the PA guidelines.
Related schemes
How has the scheme changed?
Announced by the PA on 25 Feb 2026 as an additional €2m nationwide stream for non-UCA scheduled buildings.
Call 1 opened 9 Mar 2026 and closed 16 Mar 2026.
By 25 Mar 2026
99 submissions, 14 qualified, about €1m used; €500,000 of the unallocated funds moved to Gozo (PA news; gov.mt PR260485).
18 Jun 2026
A further €1m announced for a second call (gov.mt PR261025en); no official dates published.
Official sources
- IDVSB26 Guidance Notes (20 pp.)Planning Authority · checked 8 Nov 2026
- Template for obligatory Bill of QuantitiesPlanning Authority · checked 8 Nov 2026
- €2 Million Grant Scheme Opens for Scheduled Buildings Outside UCAs (9 Mar 2026)Planning Authority · checked 8 Nov 2026
- Reġjun Għawdex oversubscribed within hours (25 Mar 2026), with take-up figures for the scheduled tranchePlanning Authority · checked 8 Nov 2026
- Nofsinhar launch, with the additional €2m for non-UCA scheduled buildings announced (25 Feb 2026)Planning Authority · checked 8 Nov 2026
- Diskors tal-Budget 2027 (Budget Speech 2027, Maltese, 26 October 2026)Ministry for Finance · checked 8 Nov 2026
- Stqarrija: Tinfetaħ għar-Reġjun Għawdex 'Irrestawra Darek u l-Villaġġ' (25 Mar 2026)Ministry for Gozo and Planning (DOI) · checked 11 Nov 2026
- Press release: €6.5 million for the Eastern Region and an additional one million euros for scheduled properties outside UCAs (18 Jun 2026)Ministry for Infrastructure, Planning and Employment (DOI) · checked 11 Nov 2026
Legal basis: PA administrative scheme (PA funds). State aid for undertakings follows Commission Regulation (EU) 2023/2831 (de minimis). The scheme took effect on 20 Jan 2026 (guidelines, Appendix A).
Common questions
Frequently asked questions
100% of eligible costs, up to €100,000 for a Grade 1 or €50,000 for a Grade 2 scheduled building outside a UCA; €15,000 per owner where the building has several owners filing separately.
Owners, tenants or emphyteuta of a Grade 1 or Grade 2 scheduled building located outside a UCA, in Malta or Gozo. Private individuals or legal entities, undertakings (de minimis aid, max €300,000 per single undertaking over 3 rolling years, published in a central register from 1 Jan 2026) and registered NGOs. Any use of the building is allowed (not limited to residential).
Status on 11 November 2026: Unclear. Call 1 closed on 16 Mar 2026; a second call with a further €1m was announced on 18 Jun 2026, but the Planning Authority has published no opening or closing dates for it.
Keep reading
Related Pedament guides
Property grants in Malta & Gozo
32 grants, subsidies and stamp duty reliefs in one list, with what is open now.
Read guideIrrestawra Darek
100% of eligible restoration costs, capped at €15,000 for a property in a UCA, €50,000 for a Grade 2 scheduled building in a UCA and…
Read guideGozo façade restoration grant
Up to €15,000 for a heritage building and up to €25,000 for a Grade 1 or Grade 2 scheduled building, per request for funding, for façade…
Read guideAmounts and rules are set by the issuing body and can change; confirm with them before you apply. Checked against official sources on 11 November 2026. This page is general information, not legal or tax advice.
Ready to explore?
Compare this scheme with the other grants and reliefs in this guide.
See all 32 schemes